QUICK RESPONSE

QUICK RESPONSE WHATSAPP ONLY

              

CATEGORIES

CERTIFICATE

COPYRIGHT AGREEMENT

 

Browse by Subject

  • Agricultural Sciences
  • Biology and Life Sciences
  • Chemistry & Chemical Engineering
  • Medicine, Health & Food
  • Physics
  • Materials Science
  • Mathematics & Statistics
  • Electrical & Computer Science
  • Earth, Energy & Environment
  • Architecture & Civil Engineering
  • Transportation & Logistics
  • Engineering & Technology
  • Economics & Management
  • Education
  • Social Sciences & Psychology
  • Arts, Literature & Linguistics

 

Existing scenario of building code implementation in newly formed “nagarjun municipality”

  • strict warning: Non-static method view::load() should not be called statically in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/views.module on line 906.
  • strict warning: Declaration of views_handler_filter::options_validate() should be compatible with views_handler::options_validate($form, &$form_state) in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/handlers/views_handler_filter.inc on line 607.
  • strict warning: Declaration of views_handler_filter::options_submit() should be compatible with views_handler::options_submit($form, &$form_state) in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/handlers/views_handler_filter.inc on line 607.
  • strict warning: Declaration of views_handler_filter_boolean_operator::value_validate() should be compatible with views_handler_filter::value_validate($form, &$form_state) in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/handlers/views_handler_filter_boolean_operator.inc on line 159.
  • strict warning: Declaration of views_plugin_row::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/plugins/views_plugin_row.inc on line 134.
  • strict warning: Declaration of views_plugin_row::options_submit() should be compatible with views_plugin::options_submit(&$form, &$form_state) in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/plugins/views_plugin_row.inc on line 134.
  • strict warning: Non-static method view::load() should not be called statically in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/views.module on line 906.
  • strict warning: Declaration of views_plugin_style_default::options() should be compatible with views_object::options() in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/plugins/views_plugin_style_default.inc on line 24.
  • strict warning: Non-static method view::load() should not be called statically in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/views.module on line 906.
  • strict warning: Non-static method view::load() should not be called statically in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/views.module on line 906.
  • strict warning: Declaration of views_handler_argument::init() should be compatible with views_handler::init(&$view, $options) in /home4/vibu/public_html/journalajst.com/sites/all/modules/views/handlers/views_handler_argument.inc on line 744.
Author: 
Subash Kumar Bhattarai and Anjay Kumar Mishra
Abstract: 

Government of Nepal has enforced to implement the building code and bye-laws in all municipalities. So, implementation status of building code must be evaluated in newly formed municipality. The research is focused to find the existing scenario of building code implementation through Mandatory Rule of Thumb (MRT) along with adopted process, existing institutional mechanism, existing level of awareness, capability, perspective and the % of various components of cost for building in newly formed Nagarjun Municipality. The adopted process and existing institutional mechanism for the implementation of building code is not effective due to lack of building code implementation section and non-functionality of environmental section and insufficient manpower. The awareness level of stakeholders was found good regarding technical matter on building bye laws and building code. The designers and local contractors were capable in implementing building code through trainings though they realize need of trainings for continues improvement. Municipal engineers and technical manpower were academically sound though they lack relevant trainings for effective implementation of building code and bye-laws. Due to awareness of house owner they were found positive for building code and bye-laws to have systematic construction with a view to reduce the impact of earthquake. The implementation of MRT was applied in permitted drawings and in construction also. The cost of a residential building was found 21 % on an average for its structural component, 45 % for non-structural components and remaining 34% by content cost. Content cost depends on owner’s perspective but other two costs depend on MRT. It showed that % cost of structural component is less though it provides structural strength in buildings

EDITOR-IN-CHIEF

 

               Prof. Dr. ISMAIL YILDIRIM

CALL FOR PAPERS

CURRENT ISSUE

 

IMPACT FACTOR CERTIFICATE